Tools to support everyday organisation!

12 Week DIY Home Project Planner

$22.50

The 12 Week DIY Home Project Planner is a large format planning poster designed to organise information related to home projects over a twelve week period. It features a structured weekly layout with space that can be used to add goals, list tasks completed, record tools or equipment used, and include brief summaries. All content and use of the sections are decided by the user.

The planner is divided into twelve weekly panels. Each panel contains clearly defined areas that can be written in as needed, allowing the layout to be adapted to different types of DIY or home projects. The structure provides a consistent way to keep notes, references, and project details visible across the twelve week timeframe.

✨ How It Works

The chart provides designated spaces that can be used to add goals, record completed tasks, note tools or equipment, and include short summaries for each week. All entries are written in by the user. Sections can be used in any order or left blank, depending on how the planner is applied.

🖼 Poster Sizes

Available in 16 × 20 inches and 18 × 24 inches.
Both sizes provide clear, spacious writing areas suitable for wall display in home offices, workshops, garages, or shared planning spaces.

🖼 About the Preview Images

The first image shown is the original high resolution 18 × 24 inch design file used for printing. This master version shows the planner exactly as it appears when printed.

When 18 × 24 inches is selected, the additional images are digital mockups showing the proportions of that size.

When 16 × 20 inches is selected, the first image remains the 18 × 24 inch master file and the following mockups demonstrate how the layout scales proportionally to 16 × 20 inches.

Mockup images are provided for display purposes and may show small visual differences on screen. Printed posters are produced from the original high resolution file.

Please see the home page for references to visual mockups of relevant available poster sizes.

Select size

More details

  • Paper thickness: 0.26mm
  • Paper weight: 189 g/m²
  • Opacity: 94%
  • ISO brightness: 104%

SEO

Supplementary descriptive terms:
12 week diy planner poster, diy project planning chart, home project planner poster, 12 week project organiser, diy work planning poster, home improvement planning chart, weekly diy project planner, project planning wall poster, diy task record chart, home project tracking poster, 12 week work planner grid, diy planning template poster, home renovation planning chart, project notes wall planner, diy tools and tasks record, weekly project overview poster, home project organisation chart, blank diy planner poster, diy project log chart, 12 week planning poster.

Quality Guarantee & Returns

  • Quality is guaranteed. If there is a print error or visible quality issue, we'll replace or refund it.
  • Because the products are made to order, we do not accept general returns or sizing-related returns.