Welcome to Habit Maze! Simple structured tools for families, adults and couples.

Habit Maze creates large format posters that turn everyday information into clear, usable layouts you can keep visible. Each design is built so it can fit naturally into home life, shared spaces, and personal planning areas.

The collection includes posters for planning, recording, shared household notes, memory keeping, and documenting milestones. Some layouts are fully blank for users who want complete flexibility. Others offer gentle structure, such as numbered sections, dated spaces, or columns, so information stays organised and easy to revisit.

All posters are designed to be user led. What gets written on them, when they are used, and how they are completed is entirely up to the individual or household. The layouts are intentionally open so they can be adapted to different routines, preferences, and types of information without assuming a single correct way to use them.

Before you begin browsing, please select your preferred currency and country from the menu. This ensures your order is printed and delivered locally. All posters are professionally printed and shipped directly to you. Please allow up to 11 days for production and delivery. - Delivery Usually between 5-11 days.

Digital Files!

Have you looked at our digital files?
We also offer a selection of downloadable digital files designed for printing at home. Browse the digital collection below to explore the available formats.

Why a poster works best?

At first glance, itโ€™s reasonable to wonder why a poster is any different from writing notes on a piece of paper or in a notebook. The difference is not about efficiency or performance, but about presence. A poster exists in a fixed, visible place. Once it is unrolled and placed on a wall, noticeboard, or fridge, it becomes part of the environment rather than something stored away. It remains where it is placed, visible during everyday moments, without needing to be opened, searched for, or revisited intentionally. Our posters are designed with this physical presence in mind. The 16 ร— 20 inch size works well in home spaces such as kitchens, hallways, or noticeboards, where information is often kept within view. The 18 ร— 24 inch format provides a larger surface suited to rooms where a more prominent display feels appropriate. Both sizes are professionally printed with clear spacing and structured layouts that make them easy to read and write on over time.

Our poster sizes

๐Ÿ–ผ Poster Size: 16 ร— 20 Inches

Our 16 ร— 20 inch posters are perfect for smaller spaces such as fridges, home offices, or notice boards. Compact but clear, this size keeps your challenge visible and accessible without taking up too much wall space. Each design remains easy to read, neatly structured, and ready to frame in a standard 16 ร— 20 inch frame and ideal for keeping your records front and centre every day.

Our poster sizes

๐Ÿ–ผ Poster Size: 18 ร— 24 Inches

Our 18 ร— 24 inch posters are designed to make an impact. This larger format is ideal for bedrooms, offices, gyms, or classrooms โ€” anywhere you want your challenge to stand out. The size allows plenty of room for grids and tasks. Each poster is printed clearly and cleanly, making it easy to follow.